- Contact Person : Ms. Sha yezhen
- Company Name : Wuxi City Marui Environmental Protection Technology Co., Ltd.
- Tel : 86-510-83216679
- Fax : 86-510-85487502
- Address : Jiangsu,wuxi,No.26 Jingsheng road Qianqiao town industrial park Huishan district, Wuxi city.
- Country/Region : China
- Zip : 214151
durable, safety and cheap cuplock scaffolding
Cuplock scaffolding
Features:
It is the world’s most widely used scaffold system. It is 20% lighter and 30% faster than the traditional ones. Besides, it uses high-grade tube and can resist high damage.
Vertical: 1.0m-2.0m-3.0m 500mm 600mm intervals or as your requirements
Ledger: 0.6m-0.9m-1.3m-1.8m-2.5m-3m
1.Materials: Q195, Q215, Q235 welded steel pipe and also do as your requirement.
2.Producing process: Cutting, forged, casted, pressed, welding, pained.
3.Surface treatment: hot dip galvanization, electroplated zinc, spray painting, plastic painted.
4. Vertical height: 1.0m-2.0m-3.0m middle disc interval 0.5m or 0.6m and your any size5. Horizontal ledger: 0.6m-0.9m-1.3m-1.8m-2.5m-3.0m and your any size.6. Installation: a. put the ledgers inserts into the bottom bowl. b. Drop down the top bowl and rotate. a. put the plug into the disc c. tighten the top bowl with hammer. b. tighten the insert with hammer
7. Disassemble: tighten the top bowl and collect the components.
8. Widely used: can be widely applied to construction, bridge tunnel, equipment installation, decoration, shipbuilding and other projects.
9. Components: ledger, standard, brace, base jack, joint stick and pin, connect pin, transom.
10. Export market: Middle East, Asia, Africa, West Europe, and South America.
11. Quality control: certificate JOD1996 and OD15001-1205. ISO9001-2008.
13. Advanced structural design and heavy load bearing capacity.
14. Overcome the difficulty of non-standard construction, suited to diverse range of on-site scaffold operations.15. Single scaffold kit, no extra clamps or accessories as well as small parts.
16. Individual scaffolding parts can be packed in bundles for easy storage and transportation.
17. Pre-measurement components, no measurement needed.
18.There are no loose components on the ringlock that can be lost or require
durable, safety and cheap cuplock scaffolding